Last edited by Kezragore
Friday, April 17, 2020 | History

4 edition of Reinstatement of license for Federal Energy Regulatory Commission project numbered 7307 found in the catalog.

Reinstatement of license for Federal Energy Regulatory Commission project numbered 7307

United States. Congress. House. Committee on Energy and Commerce

Reinstatement of license for Federal Energy Regulatory Commission project numbered 7307

report (to accompany H.R. 4417) (including cost estimate of the Congressional Budget Office).

by United States. Congress. House. Committee on Energy and Commerce

  • 157 Want to read
  • 32 Currently reading

Published by U.S. G.P.O. in [Washington, D.C .
Written in English

    Subjects:
  • Hydroelectric power plants -- Licenses -- West Virginia,
  • Hydroelectric power plants -- Law and legislation -- West Virginia

  • Edition Notes

    SeriesReport / 109th Congress, 2d session, House of Representatives -- 109-685.
    Classifications
    LC ClassificationsKF32 .E55 2006v
    The Physical Object
    Pagination5 p. ;
    ID Numbers
    Open LibraryOL17631486M
    OCLC/WorldCa74887275

    FEDERAL REGISTER]. FOR FURTHER INFORMATION CONTACT: Katherine Liberty Office of the General Counsel Federal Energy Regulatory Commission First Street, NE Washington, DC () [email protected] Gordon Wagner Office of the General Counsel Federal Energy Regulatory Commission First Street, NE Washington, DC   Federal Energy Regulatory Commission (FERC) Licensing Support. Under the Federal Power Act, the Federal Energy Regulatory Commission (FERC) has the exclusive authority to license non-federal hydropower projects on navigable waterways and federal lands with review of state and federal ng and operating hydropower projects can . 77 FR , Notices, DEPARTMENT OF ENERGY (DOE) Federal Energy Regulatory Commission (FERC), [Project No. ], Lock+ Hydro Friends Fund XLII, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process.


Share this book
You might also like
Brownings heroines

Brownings heroines

Looking at food

Looking at food

The Swiss multi-pillar pension system

The Swiss multi-pillar pension system

Dead Mans Island

Dead Mans Island

Out from the shadow of other gods

Out from the shadow of other gods

Forbidden fruit, and other ballades

Forbidden fruit, and other ballades

Expanding the superstrate

Expanding the superstrate

Speaking 3

Speaking 3

Making way for cyclists

Making way for cyclists

Housing the elderly

Housing the elderly

Strippers!

Strippers!

High cost of living

High cost of living

Reinstatement of license for Federal Energy Regulatory Commission project numbered 7307 by United States. Congress. House. Committee on Energy and Commerce Download PDF EPUB FB2

Reinstatement of license for Federal Energy Regulatory Commission project numbered report (to accompany H.R. ) (including cost estimate of the Congressional Budget Office).

Get this from a library. Federal Energy Regulatory Commission project license reinstatement: report together with minority views (to accompany S.

[United States. Congress. Senate. Committee on Energy and Natural Resources.]. Federal Energy Regulatory Commission project As ordered reported by the House Committee on Energy and Commerce on Septem H.R.

would authorize the Federal Energy Regulatory Commission (FERC) to reinstate the license for a hydroelectric project (number ) in West Virginia.

The bill also would. Directs the Federal Energy Regulatory Commission (FERC), upon the request of the licensee for the project numberedto extend the time required for commencement of construction of the project until Decem Provides for reinstatement of an expired license.

H.R. ( th): To provide for the reinstatement of a license for a certain Federal Energy Regulatory Commission project. The Federal Energy Regulatory Commission (FERC) provides this letter on an annual basis to all who have been issued a License or Exemption to operate or construct a hydroelectric facility, regardless of the size of the Size: 44KB.

County, Washington (“District”) hereby applies to the Federal Energy Regulatory Commission (“FERC” or “Commission”) for an amendment of the Jackson Project Recreation Resource Management Plan (“RRMP”) for the Henry M. Jackson Hydroelectric Project, Project No. (“Jackson Project”).

Engineering Guidelines for the Evaluation of Hydropower Projects. Chapter 4 – Embankment Dams (Revised Draft Version) The Division of Dam Safety and Inspections, Office of Energy Projects, has provided more detail and has included additional practical dam safety information as well as information on dam safety experiences in Chapter IV, Embankment Dams of the Federal Energy Regulatory.

FERC Online Home Page: Welcome to FERC Online. FERC Online is the single entry point for all of FERC’s electronic access applications.

If you have not previously eRegistered with FERC Online, please use the New Registration link on the left menu to do so.

Once you are registered, you will be able to login to FERC Online to eSubscribe and eFile. In the new eLibrary interface, Daily and Advanced Search will be consolidated into General Search. To perform a Daily Search, simply enter today’s date in both the To and From date fields.; Once you obtain a result, click on the Columns option in the submenu at the top of the screen to select the fields of data that you want to display as columns in your search results.

Notwithstanding the time period specified in section 13 of the Federal Power Act (16 U.S.C. ) that would otherwise apply to the project numbered of the Federal Energy Regulatory Commission, the Commission shall, on the request of the licensee for the project, in accordance with that section (including the good faith, due diligence, and public interest.

would Reinstatement of license for Federal Energy Regulatory Commission project numbered 7307 book the Federal Energy Regulatory Commission (FERC) to reinstate the license for a hydroelectric project (number ) in West Virginia.

The bill also would extend the deadline for commencing construction of that project until Decem CBO estimates that implementing S. would have no net effect on the federal budget.

Note: Click on each category to sort alphabetically Keyword Search of Projects: or Browse list of all projects Select Region here. (a) IN GENERAL- Notwithstanding the time period specified in section 13 of the Federal Power Act (16 U.S.C.

) that would otherwise apply to the Federal Energy Regulatory Commission project numberedthe Commission shall, upon the request of the licensee for the project, in accordance with the good faith, due diligence, and public.

Project No. - 25 - license issued for this project. Execution of the PA demonstrates the Commission’s compliance with section of the NHPA. Forest Service condition 3 requires Seattle to implement the PA and associated HPMP (Ordering Paragraph E).File Size: KB.

FERC 61, FEDERAL ENERGY REGULATORY COMMISSION. WASHINGTON, D.C. Before Commissioners: Jon Wellinghoff, Chairman; Philip D. Moeller, John R. Norris. FERC Online does not require the submission of personally identifiable Information (PII) (e.g. social security numbers, birthdates, and phone numbers), and FERC will not be responsible for any PII submitted to FERC Online, including any accidental or inadvertent submissions of PII.

SECTION 1. REINSTATEMENT OF LICENSE FOR FEDERAL ENERGY REGULATORY COMMISSION PROJECT. (a) In General- Notwithstanding the time period specified in section 13 of the Federal Power Act (16 U.S.C. ) that would otherwise apply to project numbered of the Federal Energy Regulatory Commission, the Commission.

[After this Chapter had been prepared, the Federal Energy Regulatory Commission issued Order No. A, denying rehearing on, but making some changes in, and clarifying other statements in, Order No. Esposito was kind enough to prepare an addendum to this Chapter--Section descirib-ing some.

Federal Energy Regulatory Commission Page 3 May 1, (“CAISO”) Board of Governors on Janu It was subsequently approved by the CPUC through its regulatory proceedings. The TRTP segments have been (or will be upon completion) placed under the operational control of the CAISO.

ENERGY REGULATORY COMMISSION PROJECT INVOLVING CANNONSVILLE DAM. (a) IN GENERAL.—Notwithstanding the time period specified in section 13 of the Federal Power Act (16 U.S.C. ) that would other-wise apply to the Federal Energy Regulatory Commission project numberedthe Fed-eral Energy Regulatory Commission.

NUMERICAL LISTS OF DOCUMENTS AND REPORTS of the th CONGRESS, 2d SESSION No. SENATE DOCUMENTS Serial No. Financial Services Regulatory Relief Act of Federal Energy Regulatory Commission Project license reinstatement. FirstLight Power Resources (FirstLight) holds a license from the Federal Energy Regulatory Commission License.

Article of the Project License requires FirstLight to regulate the non-project use and occupancies within the Project boundary. Non-project uses and occupancies must be consistent with the purposes of protecting and enhancing the. SUMMARY: The Federal Energy Regulatory Commission (Commission) is proposing to revise Parts 38 and of the Commission’s regulations to provide explicit authority to interstate natural gas pipelines and public utilities that own, operate, or control facilities used for the transmission of electric energy in interstate commerce to share non.

The Federal Energy Regulatory Commission (FERC) is the federal agency charged with determining whether or not proposed LNG import facilities are in the public interest and interstate pipeline projects are in the public convenience and necessity.

As a part of that determination, the FERC has begun a pre -filingFile Size: 2MB. Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, Section 1. Extension. [(a) In General.— Notwithstanding the time period specified in section 13 of the Federal Power Act (16 U.S.C.

) that would otherwise apply to the Federal Energy Regulatory Commission project numberedthe Commission. In compliance with the requirements of section of the Paperwork Reduction Act of44 U.S.C.the Federal Energy Regulatory Commission (Commission) has submitted the information collection described below to the Office of Management and Budget (OMB) for review and reinstatement of.

Reference: Deficiency of License Application and Additional Information Request Dear Mr. Moore: Your license application filed on August 1,does not fully conform to the Federal Energy Regulatory Commission’s (Commission's) regulations.

The deficiencies are identified in the enclosed Schedule A. Under section (e)(1) of the regulations. in the supreme court of the united states federal energy regulatory commission, petitioner v. electric power supply association, et al. on petition for a writ of certiorari to the united states court of appeals for the district of columbia circuit appendix to the petition for a writ of certiorari david l.

morenoff general counsel. 75 FRNotices, DEPARTMENT OF ENERGY (DOE) Federal Energy Regulatory Commission (FERC), [Project No.

], Cordova Electric Cooperative, Inc.; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Alternative Licensing Procedures.

Notwithstanding the expiration of the license and notwithstanding the time period specified in section 13 of the Federal Power Act (16 U.S.C. ) that would otherwise apply to the Federal Energy Regulatory Commission Project No.

[the Pike Island project], the Commission shall, at the request of the licensee for the project [Orrville. The Federal Energy Regulatory Commission (FERC) is the United States federal agency that regulates the transmission and wholesale sale of electricity and natural gas in interstate commerce and regulates the transportation of oil by pipeline in interstate commerce.

FERC also reviews proposals to build interstate natural gas pipelines, natural gas storage projects, and Headquarters: Washington, D.C., U.S. Secretary, Federal Energy Regulatory Commission, First Street, NE, Washington, DC Please include the project number (P) on any comments or motions filed.

The Commission's Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose. Section 1. Short title []. This Act may be cited as the “Collinsville Renewable Energy Promotion Act”.

Sec. Reinstatement of expired licenses and extension of time to commence construction of projects []. Subject to section 4 of this Act and notwithstanding the time period under section 13 of the Federal Power Act (16 U.S.C.

) that would otherwise apply to Federal Energy Regulatory. Federal Energy Regulatory Commission First Street, NE Washington, DC Re: Texas Eastern Transmission, LP, Docket No.

RP____ New Jersey - New York Expansion Project, Docket No. CP Dear Ms. Bose: Pursuant to Section 4 of the Natural Gas Act1 and Part of the regulations of the. The National Labor Relations Act of (also known as the Wagner Act) is a foundational statute of United States labor law which guarantees the right of private sector employees to organize into trade unions, engage in collective bargaining, and take collective action such as act was written by Senator Robert F.

Wagner, passed by the 74th United States Enacted by: the 74th United States Congress. Federal Energy Regulatory Commission First Street, N.E. Washington, DC Dear Ms. Bose: Pursuant to Section of the Federal Energy Regulatory Commission’s (“Commission” or “FERC”) regulations under the Federal Power Act (18 C.F.R.

§ ), Southern California Edison Company (“SCE”) tenders for filing a Small. Marie Cusick / StateImpact Pennsylvania.

Protesters were arrested for blocking a public passageway outside the Washington D.C. headquarters of the Federal Energy Regulatory Commission in July, eLibrary (formerly FERRIS) Search: GenSearch: New Dockets: Docket Search: Daily Search: Your query has a parsing error.

Please try again. Federal Energy Regulatory Commission [Project No. ] Brookfield White Pine Hydro LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions to Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a.

1. Pursuant to section of the Federal Power Act (FPA), the Federal Energy Regulatory Commission (Commission) approves Reliability Standard PRC (Remedial Action Schemes).1 The North American Electric Reliability Corporation (NERC), the Commission-certified Electric Reliability Organization (ERO), submitted.Kimberly D.

Bose, Secretary, Federal Energy Regulatory Commission, First Street, N.E., Room 1A, Washington, DC All written or e-mailed requests must specify your wish to be added to, or removed from, the mailing list, and must clearly identify the project name and FERC project number (e.g., Wallace Dam Pumped Storage Project, P.Federal Energy Regulatory Commission First Street, N.E.

Washington, DC FERC Office of Energy Projects Douglas A. Sipe @ Michael McGehee [email protected]